PyroGenesis Unveils New Mini – DROSRITE™ System; Provides Update on DROSRITE™ Business Line.

MONTREAL, June 25, 2018 (GLOBE NEWSWIRE) -- PyroGenesis Canada Inc. (http://pyrogenesis.com) (TSX-V:PYR) (OTCQB:PYRNF), a TSX Venture 50® high-tech company, (the "Company", the “Corporation” or "PyroGenesis") a Company that designs, develops, manufactures and commercializes plasma waste-to-energy systems and plasma torch products, is pleased to announce today the unveiling of its new Mini- DROSRITE™ System, and provides herein a general update on its DROSRITE™ business line.

Figure 1
PyroGenesis' Drosrite™ System


Table 1
Worldwide Dross Production


Mr. P. Peter Pascali, President and CEO of PyroGenesis, provides this update in the following Q&A format.  The questions are for the most part derived from inquiries received from investors, analysts, and potential customers:

Q. For those that are new to the story, could you please describe to us what DROSRITE™ is and some of its many advantages?

A.  Most certainly.

PyroGenesis' DROSRITE™ system is a salt-free, cost-effective, sustainable process for maximizing metal recovery from dross, a waste generated in the metallurgical industry. PyroGenesis' patented process avoids costly loss of metal while reducing a smelter's carbon footprint and energy consumption, thereby providing an impressive return on investment.

With metal manufacturers, such as aluminum, being subjected to increased pressure from regulatory authorities to eliminate landfilling of hazardous salt cakes from traditional recovery operations, combined with tight operating margins, PyroGenesis’ DROSRITE™ system is able to (i) increase metal recovery from waste, without producing any hazardous by-products, while at the same time (ii) reducing operating costs.

A figure accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/0477bddb-0899-4efa-82b7-103f8d8a50a0

In short, our DROSRITE™ system is (i) salt-free, so no hazardous by-products, (ii) can process the dross cheaper than conventional methods, and (iii) has demonstrated higher metal recovery rates. Who could ask for more?

Click on the link below to watch the DROSRITE™ video:

http://www.pyrogenesis.com/products-services/advanced-materials-processing/drosrite/

Q. What is a Mini–DROSRITE™ System?

A.  It is a system that can process dross in much smaller capacities.  The Mini - DROSRITE™ System can economically process 500 tons of dross/year as compared to the 3,000-7,500 tons/yr that our current systems are designed for.  This smaller system enables us to target thousands of smaller facilities which were not originally in our target market.  The price tag of $600k has a similar pay-back for clients as our original designs.

Our previously announced second demonstration system will be completed shortly and it is already booked for a paid-for-demonstration in September 2018 for a North America client who has a need for a Mini - DROSRITE™ System.  If successful, this client has a need for an additional 11 Mini - DROSRITE™ Systems.

Q. How big is this market for Dross?

A.  We have targeted three (3) main dross streams; aluminum, copper, and zinc, each divided between primary, secondary and casting producers. Presently we are focusing on the three segments within aluminum dross, and we recently announced our expansion into primary zinc production with a paid-for-demonstration in India for such.

A table accompanying this announcement is available at  http://www.globenewswire.com/NewsRoom/AttachmentNg/a1ad3ce0-184b-4b8b-b0bb-9c59127a591a

Our original estimate of the total dross produced was vastly underestimated.  It was a conservative calculation derived from world-wide aluminum production figures.  We estimated that total aluminum dross produced was between 1.5 - 2 million tonnes per year1, and that represented a potential market for DROSRITE™ systems numbering in the hundreds of units.  Based on a recent report in AlCircle “Aluminum Dross Processing: A global review”, which references exact dross production, total aluminum dross produced is over 3 million tonnes per year2, more than double what we estimated. Combined with the increased market penetration we now have with the Mini-DROSRITE™ design, we estimate the market for DROSRITE™ to be in the thousands of units and not the hundreds of units we originally estimated.

Q. You mentioned your expansion into Zinc Dross handling.  Can you give us an update?

A.  Everything is on schedule.  Our demonstration system should be on site within two (2) weeks.  Demonstrations will begin immediately and last approximately one (1) month. Given the price of zinc relative to aluminium (zinc prices are $1.37/lb compared to aluminum which is $0.99/lb) we expect the economics to be significantly better than our aluminium DROSRITE™ systems.

Q. With this news and the previously announced paid-for-demonstrations, we would have expected some signed contracts by now.  Is the DROSRITE™ business line still poised to be a significant contributor in 2018?   Is there still a high probability that PyroGenesis will be profitable in 2018 from DROSRITE™ system sales alone when combined with backlog?

A.  DROSRITE™ is certainly poised to be a major contributor in 2018 and we absolutely see it being a significant reason behind profitability. 

We fully expected to have additional contracts signed by now, but we are definitely not disappointed with where we are, particularly when taken in context of the full year. Cultural differences, time zones, political unrest and religious holidays have all played their part in negotiations and schedules. An additional unanticipated element is that since we now have a fully operational system in place there have been requests for site visits which, again, take time. Notwithstanding these developments and given the continued demand we have for paid-for-demonstrations, we are confident with respect to the estimates we projected for this business line for 2018 and beyond.

1 | 2  Next Page »
Featured Video
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Senior Principal Software Engineer for Autodesk at San Francisco, California
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Principal Engineer for Autodesk at San Francisco, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise