UMC Reports Fourth Quarter 2015 Results

(1)One 6-inch wafer is converted into 0.5625(62/82) 8-inch equivalent wafer; one 12-inch wafer is converted into 2.25(122/82) 8-inch equivalent wafers.  Capacity total figures are expressed in 8-inch equivalent wafers.

 

CAPEX for Foundry Segment

Capital Expenditure by Year - in US$ billion

Year

2015

2014

2013

2012

2011

CAPEX

$ 1.9

$ 1.4

$ 1.1

$ 1.7

$ 1.6

2011~2012 figures account for UMC parent company only

 

2016 CAPEX Plan

8"

12"

Total

5%

95%

US$2.2 billion

4Q15 CAPEX spending was US$410 million. Full year 2015 CAPEX totaled US$1.9 billion including US$190 million for Fab 12X. Foundry capital expenditure budget for 2016 is expected to be approximately US$2.2 billion, mainly for capacity deployment in 300mm facilities.

Brief Summary of Full Year 2015 Consolidated Results

Operating Results

(Amount: NT$ million)

2015

2014

YoY %
change

Net Operating Revenues

144,830

140,012

3.4

Gross Profit

31,769

31,853

(0.3)

Operating Expenses

(19,969)

(21,238)

(6.0)

Net Other Operating Income & Expenses

(964)

(539)

78.8

Operating Income

10,836

10,076

7.5

Net Non-Operating Income & Expenses

2,876

3,437

(16.3)

Income Tax Expense

(876)

(2,033)

(56.9)

Net Income Attributable to Stockholders of the Parent

13,449

12,141

10.8

EPS (NT$ per share)

1.08

0.97

 

       (US$ per ADS)

0.165

0.148

 
  • Consolidated revenue increased 3.40% YoY to NT$144.83 billion, up from NT$140.01 billion in 2014. Foundry segment revenue in 2015 increased 9.0% YoY to NT$141.19 billion, up from NT$129.53 billion in 2014.
  • Gross margin was 21.9%, compared to 22.8% in 2014.
  • Operating margin was 7.5%, compared to 7.2% in 2014.
  • Net income attributable to stockholders of the parent was NT$13.45 billion for 2015.
  • EPS was NT$1.08, or EPADS was US$0.165 for 2015.
  • The overall percentage of revenue from 28nm was 10% in 2015, while revenue from 40nm increased to 24%.

« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14  Next Page »
Featured Video
Jobs
Geodetic Analyst, GIS Center (1282) for Idaho State University at Pocatello, Idaho
GIS Analyst for San Bernardino County Transportation Authority at San Bernardino, California
GEOGRAPHIC INFORMATION SYSTEM (GIS) COORDINATOR for Lassen County at Susanville, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Upcoming Events
Esri User Conference 2024 at san diego CA - Jul 15 - 19, 2024
URISA GIS Leadership Academy at Chicago IL - Aug 12 - 16, 2024
Commercial UAV Expo 2024 at Caesars Forum Las Vegas NV - Sep 3 - 5, 2024
Intergeo 2024 at Messe Stuttgart Messepiazza 1 Stuttgart Germany - Sep 24 - 26, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise