TowerJazz Reports Second Quarter 2014 Results

About TowerJazz

Tower Semiconductor Ltd. (NASDAQ: TSEM, TASE: TSEM), its fully owned U.S. subsidiary Jazz Semiconductor, Inc. and its fully owned Japanese subsidiary TowerJazz Japan, Ltd., operate collectively under the brand name TowerJazz, the global specialty foundry leader. TowerJazz also owns 51% of TowerJazz Panasonic Semiconductor Co., Ltd., newly established with Panasonic Corporation. TowerJazz manufactures integrated circuits, offering a broad range of customizable process technologies including: SiGe, BiCMOS, Mixed-Signal/CMOS, RF CMOS, CMOS Image Sensor, integrated Power Management (BCD & 700V), and MEMS capabilities. Through TowerJazz Panasonic Semiconductor Co., TowerJazz offers best of class 65nm CMOS image sensor dark current and quantum efficiency performance as well as 45nm digital technology. TowerJazz provides a world-class design enablement platform that enables a quick and accurate design cycle. TowerJazz also offers Transfer Optimization and development Process Services (TOPS) to IDMs and fabless companies that need to expand capacity. To provide multi-fab sourcing for its customers, TowerJazz operates two manufacturing facilities in Israel, one in the U.S., and three in Japan. For more information, please visit www.towerjazz.com.

This press release includes forward-looking statements, which are subject to risks and uncertainties. Actual results may vary from those projected or implied by such forward-looking statements and you should not place any undue reliance on such forward-looking statements. Potential risks and uncertainties include, without limitation, risks and uncertainties associated with: (i) maintaining existing customers and attracting additional customers, (ii) cancellation of orders, (iii) failure to receive orders currently expected, (iv) the cyclical nature of the semiconductor industry and the resulting periodic overcapacity, fluctuations in operating results and future average selling price erosion, (v) material amount of fixed costs, debt and other liabilities and having sufficient funds to satisfy our fixed costs, debt obligations and other short-term and long-term liabilities on a timely basis, or to execute debt re-financing, restructuring and/or fundraising to enable the service of these debt and other liabilities, (vi) operating our facilities at high utilization rates which is critical in order to cover a portion or all of the high level of fixed costs associated with operating a foundry and our debt and in order to improve our results, (vii) our ability to satisfy the covenants stipulated in our agreements with our lenders, banks and bond holders, (viii) our ability to capitalize on the demand for our foundry services, including the ability to operate our fabs at very high utilization rates, (ix) meeting the conditions set in the approval certificates received from the Israeli Investment Center under which we received a significant amount of grants in past years, (x) our ability to accurately forecast financial performance, which is affected by limited order backlog and lengthy sales cycles, (xi) the purchase of equipment to increase capacity, the completion of the equipment installation, technology transfer and raising the funds therefor, (xii) the concentration of our business in the semiconductor industry, (xiii) product returns, (xiv) our ability to maintain and develop our technology processes and services to keep pace with new technology, evolving standards, changing customer and end-user requirements, new product introductions and short product life cycles, (xv) competing effectively, (xvi) achieving acceptable device yields, product performance and delivery times, (xvii) possible production or yield problems in our wafer fabrication facilities, (xviii) our ability to manufacture products on a timely basis, (xix) our dependence on intellectual property rights of others, our ability to operate our business without infringing others’ intellectual property rights and our ability to enforce our intellectual property against infringement, (xx) our ability to fulfill our obligations and meet performance milestones under our agreements, including successful execution of our agreement with an Asian entity signed in 2009, (xxi) retention of key employees and recruitment and retention of skilled qualified personnel, (xxii) exposure to inflation, currency exchange and interest rate fluctuations and risks associated with doing business locally and internationally, (xxiii) fluctuations in the market price of our traded securities may adversely affect our reported GAAP non-cash financing expenses, (xxiv) issuance of ordinary shares as a result of conversion and/or exercise of any of our convertible securities may dilute the shareholdings of current and future shareholders, (xxv) successfully executing our acquisitions and integrating them into our business, utilizing our expanded capacity and finding new business, including successfully operating TowerJazz Panasonic Semiconductor Co. (TPSCo), and integrating our foundry business opportunities into TPSCo fabs; (xxvi) meeting regulatory requirements worldwide; (xxvii) ceasing the Nishiwaki fab operations in the course of restructuring our activities and business in Japan, including the sale of TowerJazz Japan (‘TJP’) assets in order to fund its liabilities, settling any potential claims from its employees, labor unions, suppliers, customers or other third parties amicably to avoid deviations to our estimated accruals and allowances and so that it may pay all its employee and other obligations and liabilities and any risk that may result from any legal proceeding that may required in the course of the dissolution and closure of TJP; and (xxviii) business interruption due to fire and other natural disasters, the security situation in Israel and other events beyond our control.

A more complete discussion of risks and uncertainties that may affect the accuracy of forward-looking statements included in this press release or which may otherwise affect our business is included under the heading "Risk Factors" in Tower’s most recent filings on Forms 20-F, F-3, F-4, S-8 and 6-K, as were filed with the Securities and Exchange Commission (the “SEC”) and the Israel Securities Authority and Jazz’s most recent filings on Forms 10-K and 10-Q, as were filed with the SEC. Future results may differ materially from those previously reported. The Company does not intend to update, and expressly disclaims any obligation to update, the information contained in this release.

« Previous Page 1 | 2 | 3 | 4 | 5  Next Page »
Featured Video
Latest Blog Posts
Sanjay GangalGISCafe Guest
by Sanjay Gangal
GISCafe Industry Predictions for 2025 – NV5
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas Convention Center Las Vegas NV - Jan 7 - 10, 2025
GeoBuiz Summit 2025 at Hyatt Regency Aurora-Denver Conference Center. Denver CO - Jan 13 - 15, 2025
Coastal GeoTools 2025 Conference at 301 North Water Street - Jan 27 - 30, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise