Boeing Sets 787 First Delivery Date for Mid-First Quarter 2011

EVERETT, Wash., Aug. 27 — (PRNewswire) — The Boeing (NYSE: BA) Company said today that it now expects delivery of the first 787 in the middle of the first quarter 2011.

The delivery date revision follows an assessment of the availability of an engine needed for the final phases of flight test this fall.

While Boeing works closely with Rolls-Royce to expedite engine availability, flight testing across the test fleet continues as planned.

Boeing said last month that the cumulative impact of a series of issues, including supplier workmanship issues related to the horizontal stabilizer and instrumentation delays, could push first delivery of the 787 a few weeks into 2011. The delay in engine availability has extended that estimate to mid-first quarter 2011.

The schedule revision will not affect the company's financial guidance.  

Forward-Looking Statements

Certain statements in this report may be "forward-looking" within the meaning of the Private Securities Litigation Reform Act of 1995. Words such as "expects," "intends," "plans," "projects," "believes," "estimates," "targets," "anticipates," and similar expressions are used to identify these forward-looking statements. Forward-looking statements are based upon assumptions about future events that may not prove to be accurate. These statements are not guarantees of future performance and involve risks, uncertainties and assumptions that are difficult to predict. Actual outcomes and results may differ materially from what is expressed or forecasted in these forward-looking statements. As a result, these statements speak to events only as of the date they are made and we undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by federal securities laws. Specific factors that could cause actual results to differ materially from forward-looking statements include, but are not limited to, statements we make regarding our guidance relating to future financial and operating performance, the effect of economic conditions in the United States and globally, and general industry conditions as they may impact us or our customers, as well as the other important factors disclosed previously and from time to time in our other filings with the Securities and Exchange Commission.

Contacts:

Yvonne Leach

787 Communications

+1 206-854-5027

Email Contact

Jim Proulx

Boeing Commercial Airplanes Media Relations

+1 206-850-2102

Email Contact

SOURCE Boeing

Contact:
Boeing
Rolls-Royce
Yvonne Leach, 787 Communications
Phone: +1-206-854-5027
Email Contact
Jim Proulx, Boeing Commercial Airplanes Media Relations
Phone: +1-206-850-2102
Email Contact both of Boeing
Web: http://www.boeing.com

Featured Video
Jobs
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Manufacturing Test Engineer for Google at Prague, Czechia, Czech Republic
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Principal Engineer for Autodesk at San Francisco, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Upcoming Events
Intergeo 2024 at Messe Stuttgart Messepiazza 1 Stuttgart Germany - Sep 24 - 26, 2024
GIS-Pro 2024 at Portland ME - Oct 7 - 10, 2024
Geo Sessions 2024 at United States - Oct 22 - 24, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise