SK hynix to Build M15X Fab in Cheongju

SEOUL, South Korea, Sept. 6, 2022 — (PRNewswire) — SK hynix Inc. (or "the company", www.skhynix.com) announced today that it will build the M15X(eXtension), a new fabrication plant, in Cheongju, Chungcheongbuk-do, in preparation for future growth.

The company will start construction of the M15 extension on the site it secured previously earlier than initially planned, considering various market situations.

The new plant will be built from October on the 60,000㎡ land located in the Cheongju Technopolis industrial complex and completed early 2025. A total of 15 trillion won will be injected over the next five years to build the fab and set up production facilities. The fab will be a two-story building equivalent to a combination of M11 and M12 in size.

As for the next M17 fab, the company will decide construction plan after reviewing overall business environment including changes in the semiconductor business cycle.

"Looking back on the past 10 years, SK hynix could grow into a global company as it boldly carried out investment during crisis," said Vice Chairman and Co-Chief Executive Park Jung-ho. "As we look to prepare for the next 10 years now, I believe starting the M15X will be a first step to lay foundation for a solid future growth."

SK hynix has so far solidified its leadership in the memory market through preemptive and bold investments despite rapid changes in business environment. In 2012, when the broader industry was scaling back investments and the company was in the red, SK hynix decided to increase investment by more than 10% compared with a year ago, resulting in a dramatic turnaround by the end of the year. Market uncertainties continued to linger, but in 2015, the company built the M14 fab in Icheon to prepare for the next boom in the memory business, which led to record-high financial results for two straight years from 2017.

Since it became a member of SK Group in 2012, SK hynix has pushed forward investments for the next 10 years in accordance with the Future Vision it has made public in 2015. The Vision was the company's pledge that it will invest 46 trillion won from 2014 to build three more fabrication plants including the M14 in Icheon. Such promise was met earlier than targeted following completion of the M15 in Cheongju and the M16 in Icheon in 2018 and 2021, respectively.

Demand for memory chips is rapidly falling in the wake of the global economic slowdown and instability of the supply chain, but experts foresee that the business will start to recover steadily from 2024 and rebound in 2025 as the memory business cycle is increasingly getting less volatile in recent years.

The plan to build the M15X comes as SK hynix prepares for the next upturn expected to come in 2025. With the construction of the M15X, the company will be ready to provide more memory chips when the industry enters a boom again.

About SK hynix Inc.

SK hynix Inc., headquartered in Korea, is the world's top tier semiconductor supplier offering Dynamic Random Access Memory chips ("DRAM"), flash memory chips ("NAND flash") and CMOS Image Sensors ("CIS") for a wide range of distinguished customers globally. The Company's shares are traded on the Korea Exchange, and the Global Depository shares are listed on the Luxemburg Stock Exchange. Further information about SK hynix is available at www.skhynix.com, news.skhynix.com.

Cision View original content: https://www.prnewswire.com/news-releases/sk-hynix-to-build-m15x-fab-in-cheongju-301617986.html

SOURCE SK hynix Inc.

Contact:
Company Name: SK hynix Inc.
SK hynix Inc., Global Public Relations, Technical Leader, Kanga Kong, E-Mail: Email Contact Technical Leader, Jaehwan Kevin Kim, E-Mail: Email Contact
Financial data for SK hynix Inc.

Featured Video
Jobs
GIS Specialist for Washington State Department of Natural Resources at Olympia, Washington
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Mechanical Engineer 2 for Lam Research at Fremont, California
Principal Engineer for Autodesk at San Francisco, California
Mechanical Engineer 3 for Lam Research at Fremont, California
Upcoming Events
URISA GIS Leadership Academy at Embassy Suites Fort Worth Downtown 600 Commerce Street Fort Worth, TX - Nov 18 - 22, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise