Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost and Safety

Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost, and Safety

Bentley Systems announces the early access of Bentley’s Design Insights cloud service, a new extension of Bentley’s Scenario Services. Design Insights brings instant insight to the impact of design changes on the performance measures of organizations including project schedule, cost, and safety compliance.

Designers and engineers make hundreds of decisions in relative isolation, without fully understanding the impact of these decisions on other disciplines or downstream activities that influence project performance. Bentley’s Design Insights helps project teams make better-informed and more timely decisions that reduce cost overruns and unexpected project delays as insights into the project are gained much earlier.

Understand at a glance the ramification of change decisions on organizational and project performance metrics.

Design Insights utilizes the common digital engineering iModel created by users of Bentley’s AECOsim Building Designer, OpenPlant Modeler, RAM, STAAD, or Autodesk’s Revit™ to extract insights on key performance metrics for designers, owners, and project managers.

Bentley’s Design Insights enables:

  • Relative estimation of structural safety, cost, and schedule changes between design iterations
  • Heatmaps to identify areas of change between design iterations
  • Practical consideration of multiple design alternatives in parallel

Raoul Karp, Bentley’s VP of product development, analytical modeling, said, “Too often in today’s design world the true impact of important design decisions is not fully understood until construction is well underway. By providing designers, engineers, architects, and owners immediate insight into the downstream ramifications of decisions and tradeoffs to be made during design, team members can make better holistic decisions with the critical information at their fingertips.”

Featured Video
Latest Blog Posts
Jobs
Sr. GIS Apps Product Engineer for ESRI at Portland, Oregon
Geoprocessing Product Engineer II for ESRI at Redlands, California
Sr. GIS Apps Product Engineer for ESRI at Portland, ME, Maine
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Mechanical Engineer 2 for Lam Research at Fremont, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Upcoming Events
GeoBuiz Summit 2025 at Hyatt Regency Aurora-Denver Conference Center. Denver CO - Jan 13 - 15, 2025
Coastal GeoTools 2025 Conference at 301 North Water Street - Jan 27 - 30, 2025
GEO Week 2025 at Colorado Convention Center Denver CO - Feb 10 - 12, 2025



© 2025 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise