Watford Derailment Strengthens Mobile Mapping Argument

Sep 16, 2016 -- Today’s train derailment near Watford Junction has lead to calls for the rail industry to do more to pre-empt the impact of extreme weather conditions.

Torrential rain is believed to have lead to a landslide close to a tunnel opening, causing the 06.19 (BST) service from Milton Keynes to Euston to leave the track. The derailed train was then clipped by another, resulting in two people needing medical treatment and severe disruption to the rail network.

Now geospatial experts are warning that a more robust system of monitoring the stability of the UK rail network is required to help prevent further incidents.

“Detecting change is crucial,” argues Dr Mark Brown from geospatial technology innovator 3D Laser Mapping. “Over the past year, we’ve seen time and again that more needs to be done to monitor the structural health of railway assets and infrastructure.

“Back in February, a section of the Carlisle to Settle line was closed, whilst just weeks earlier, 120-tonnes of rubble blocked the Hexham to Prudhoe route. More recently, a bridge collapse at Barrow-upon-Soar in Leicestershire impacted on commuters across the country and cost Network Rail thousands of pounds in lost revenue. Then, of course, we have today’s incident, where sadly two people were injured.

“We know that weather is getting more extreme and an increased number of incidents like this could easily happen. However, consistent monitoring can identify at-risk areas, providing early warnings to schedule maintenance and repairs, or at least predict events before they cause irreparable damage.

“The current situation is costing rail operators enormous amounts of money in lost revenue. Things need to change.”

Mark believes European operators such as France’s SNCF are helping to set the standard when it comes to embracing new technology:

“SNCF monitors all 29,273km of its track in France using mobile mapping technology. The French rely heavily on the rail network and it’s crucial that the raw data is collected within a matter of days. This ultimately flags up issues and lessens the time it takes to start maintenance work, minimising disruption too.

“Ultimately, the rail sector will still face challenges when it comes to implementing this new technology, but with the railway being so important to the UK’s transportation infrastructure, and with ever decreasing budgets, it’s vital that they embrace the benefits of new technology and use it to plan for the future.”

http://www.3dlasermapping.com

Featured Video
Latest Blog Posts
Jobs
Sr. GIS Apps Product Engineer for ESRI at Portland, Oregon
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Geoprocessing Product Engineer II for ESRI at Redlands, California
Sr. GIS Apps Product Engineer for ESRI at Portland, ME, Maine
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Senior Principal Software Engineer for Autodesk at San Francisco, California
Upcoming Events
GeoBuiz Summit 2025 at Hyatt Regency Aurora-Denver Conference Center. Denver CO - Jan 13 - 15, 2025
Coastal GeoTools 2025 Conference at 301 North Water Street - Jan 27 - 30, 2025
2025 Los Angeles Geospatial Summit at USC Hotel 540 S Figueroa St Los Angeles - Feb 28, 2025



© 2025 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise