Emulex I/O Connectivity Solutions Deliver Added Performance and Efficiency for New Intel® Xeon® Processor E5-2600/1600 v3 Product Family-based Servers

Accelerates Next Generation Workloads, Reduces Operational Expenditures, Improves System Efficiency for Enterprises, Telcos and Cloud Data Centers

COSTA MESA, Calif. — (BUSINESS WIRE) — September 8, 2014Emulex Corporation (NYSE: ELX), a leader in network connectivity, monitoring and management, today announced that its OneConnect® family of Ethernet and Converged Network Adapters (CNAs) and LightPulse® Gen 5 (16Gb) Fibre Channel (FC) Host Bus Adapters (HBAs) are optimized for the next generation of servers based on the new Intel® Xeon® processor E5-2600/1600 v3 product families (formerly code-named Haswell), delivering added performance, scalability and efficiency. Emulex I/O connectivity solutions are designed to support next generation workloads such as big data analytics in-memory databases, virtual desktop infrastructure (VDI), and emerging compute architectures, such as network functions virtualization (NFV) for telco and OpenStack or OpenCompute-based cloud computing.

“The new Intel® Xeon® processor E5-2600/1600 v3 product families provide one of the fundamental building blocks to support scale-out, cloud architectures and next generation workloads. The new Emulex OneConnect OCe14000 family of Ethernet adapters is designed to maximize many of the new workloads that leverage the new Intel Xeon platform such as big data analytics, Ethernet-based storage, SAP Hana in-memory databases, the telco transition to NFV and classic enterprise workloads,” said Shaun Walsh, senior vice president of marketing, Emulex. “Emulex is particularly excited about the new Intel® Xeon® platform because it can change the way applications are delivered and the scale with which people can communicate and interact. It does this with a footprint and a power window that is beneficial both from a cost and environmental perspective.”

As enterprises increase workloads on their servers with bigger databases, faster applications, high density virtualization and cloud computing, data center infrastructure needs to keep pace. Emulex LightPulse HBAs and OneConnect Ethernet Network adapters and CNAs provide the CPU efficiency and scalability needed to support the increased processor core count, improved memory performance, and faster PCI Express (PCIe) throughput in the new Intel® Xeon® Processor E52600/1600 v3 product family to allow customers to scale their environments while keeping pace with the increasing computing needs of modern applications.

Key benefits of Emulex I/O connectivity solutions for the new Intel product family include the following:

  • Increased Server Efficiency: Emulex vEngineTM storage and overlay network protocol offloads combined with the 50 percent greater core count and double the memory using the latest DDR technology in the new Intel Xeon processors, drastically increase server efficiency with the ability to support more virtual machines (VMs) or virtual desktop instances (VDIs) per server.
  • Scalable Application Performance: New Intel® Xeon® processors deliver increased PCIe device scalability, supporting more adapters per server, enabling increased I/O capacity and optimal performance for applications, such as virtualization, flash, and database management systems.
  • Improved Network Bandwidth Utilization: Emulex Virtual Network Exceleration™ (VNeX) technology offloads the header encapsulation process of next generation overlay network protocols such as Network Virtualization using Generic Routing Encapsulation (NVGRE) and Virtual Extensible LAN (VXLAN), allowing customers to maintain CPU utilization thresholds and reduce CPU usage fluctuations while adding more workloads to each server in virtual networking environments.

Read the Emulex Labs blog on today’s news here.

Tweet This: .@Emulex I/O Connectivity Solutions Deliver Performance for @Intel #Xeon Processor E5-2600/1600 v3-based Servers http://ow.ly/B2VFo

Follow Emulex on Twitter.

About Emulex

Emulex, a leader in network connectivity, monitoring and management, provides hardware and software solutions for global networks that support enterprise, cloud, government and telecommunications. Emulex’s products enable unrivaled end-to-end application visibility, optimization and acceleration. The Company's I/O connectivity offerings, including its line of ultra high-performance Ethernet and Fibre Channel-based connectivity products, have been designed into server and storage solutions from leading OEMs, including Cisco, Dell, EMC, Fujitsu, Hitachi, HP, Huawei, IBM, NetApp and Oracle, and can be found in the data centers of nearly all of the Fortune 1000. Emulex’s monitoring and management solutions, including its portfolio of network visibility and recording products, provide organizations with complete network performance management at speeds up to 100Gb Ethernet. Emulex is headquartered in Costa Mesa, Calif., and has offices and research facilities in North America, Asia and Europe. For more information about Emulex (NYSE: ELX) please visit http://www.Emulex.com.

“Safe Harbor” Statement

"Safe Harbor" Statement under the Private Securities Litigation Reform Act of 1995: With the exception of historical information, the statements set forth above, contain forward-looking statements that involve risk and uncertainties. We expressly disclaim any obligation or undertaking to release publicly any updates or changes to these forward-looking statements that may be made to reflect any future events or circumstances. We wish to caution readers that a number of important factors could cause actual results to differ materially from those in the forward-looking statements. These factors include the possibility that all or a substantial portion of the cost savings targeted by us will not be realized on a timely basis or at all even though we expect to incur charges relating to the cost saving initiative and that the share repurchases implemented by us may not be completed in whole or in part or within the expected timeframe. The assumptions on which the cost savings, share repurchase and capital return goals and expectations are based necessarily involve judgments with respect to, among other things, economic, competitive and financial market conditions and the impact of the cost savings initiative on our customers, all of which are difficult or impossible to predict and many of which are beyond the Company’s control. Furthermore, our proposed changes to the membership of our board of directors may not have the desired effect in helping us achieve and implement our business and strategic goals. These factors also include the possibility that we may not realize the anticipated benefits from the acquisition of Endace Limited on a timely basis or at all, and may be unable to integrate the technology, operations and personnel of Endace into our existing operations in a timely and efficient manner. In addition, intellectual property claims, with or without merit, could result in costly litigation, cause product shipment delays, require us to indemnify customers, or require us to enter into royalty or licensing agreements, which may or may not be available. Furthermore, we have in the past obtained, and may be required in the future to obtain, licenses of technology owned by other parties. We cannot be certain that the necessary licenses will be available or that they will be obtainable on commercially reasonable terms. If we were to fail to obtain such royalty or licensing agreements in a timely manner and on reasonable terms, our business, results of operations and financial condition could be materially adversely affected. Lawsuits present inherent risks, any of which could have a material adverse effect on our business, financial condition, or results of operations. Such potential risks include continuing expenses of litigation, loss of patent rights, monetary damages, injunctions against the sale of products incorporating the technology in question, counterclaims, attorneys’ fees, incremental costs associated with product or component redesigns, liabilities to customers under reimbursement agreements or contractual indemnification provisions, and diversion of management’s attention from other business matters. In addition, the fact that the economy generally, and the network connectivity and visibility market segments specifically, have been in a state of uncertainty makes it difficult to determine if past experience is a good guide to the future and makes it impossible to determine if markets will grow or shrink in the short term. Continued weakness in domestic and worldwide macro-economic conditions, related disruptions in world credit and equity markets, and the resulting economic uncertainty for our customers, as well as the overall network connectivity and visibility markets, has and could continue to adversely affect our revenues and results of operations. As a result of these uncertainties, we are unable to predict our future results with any accuracy. Other factors affecting these forward-looking statements include but are not limited to the following: faster than anticipated declines in the storage networking market, slower than expected growth of the converged networking market or the failure of our Original Equipment Manufacturer (OEM) customers to successfully incorporate our products into their systems; our dependence on a limited number of customers and the effects of the loss of, decrease in or delays of orders by any such customers, or the failure of such customers to make timely payments; the emergence of new or stronger competitors as a result of consolidation movements in the market; the timing and market acceptance of our products or our OEM customers’ new or enhanced products; costs associated with entry into new areas of the network connectivity and visibility markets; the variability in the level of our backlog and the variable and seasonal procurement patterns of our customers; any inadequacy of our intellectual property protection and the costs of actual or potential third-party claims of infringement and any related indemnity obligations or adverse judgments; the effect of any actual or potential unsolicited offers to acquire us; proxy contests or the activities of activist investors; impairment charges, including but not limited to goodwill and intangible assets; changes in tax rates or legislation; the effects of acquisitions; the effects of terrorist activities, natural disasters, and any resulting disruption in our supply chain or customer purchasing patterns or any other resulting economic or political instability; the highly competitive nature of the markets for our products as well as pricing pressures that may result from such competitive conditions; the effect of rapid migration of customers towards newer, lower cost product platforms; transitions from board or box level to application specific integrated circuit (ASIC) solutions for selected applications; a shift in unit product mix from higher-end to lower-end or mezzanine card products; a faster than anticipated decrease in the average unit selling prices or an increase in the manufactured cost of our products; delays in product development; our reliance on third-party suppliers and subcontractors for components and assembly; our ability to attract and retain key technical personnel; our ability to benefit from our research and development activities as well as government grants related thereto; our dependence on international sales and internationally produced products; changes in accounting standards; and any resulting regulatory changes on our business. These and other factors could cause actual results to differ materially from those in the forward-looking statements and are discussed in our filings with the Securities and Exchange Commission, including our recent filings on Forms 10-K and 10-Q, under the caption “Risk Factors.”

1 | 2  Next Page »
Featured Video
Latest Blog Posts
Sanjay GangalGISCafe Guest
by Sanjay Gangal
GISCafe Industry Predictions for 2025 – NV5
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas Convention Center Las Vegas NV - Jan 7 - 10, 2025
GeoBuiz Summit 2025 at Hyatt Regency Aurora-Denver Conference Center. Denver CO - Jan 13 - 15, 2025
Coastal GeoTools 2025 Conference at 301 North Water Street - Jan 27 - 30, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise