NASA, Aerospace Business Leaders Discuss Space Launch System - Next U.S. Heavy Lift Spacecraft

HUNTSVILLE, Ala., Sept. 29, 2011 — (PRNewswire) — NASA leaders met Thursday to discuss acquisition plans for the agency's new heavy-lift rocket with hundreds of representatives of aerospace industry companies, small businesses and independent entrepreneurs. The rocket, known as the Space Launch System (SLS), will take astronauts farther into space than ever before, create high-quality jobs here at home, and provide the cornerstone for America's future human space exploration efforts.

(Logo: http://photos.prnewswire.com/prnh/20081007/38461LOGO )

The Industry Day event, hosted by NASA's Marshall Space Flight Center in Huntsville, Ala., provided industry representatives with an overview of the SLS Program and defined its near-term business requirements, including details of NASA's acquisition strategy for procurement of critical hardware, systems and vehicle elements. Marshall is leading design and development of the Space Launch System for NASA.

"This is a milestone moment for NASA, for our industry partners and for our economy," NASA Deputy Administrator Lori Garver told the group. "We at NASA have worked hard the past year to analyze and select our Multi-Purpose Crew Vehicle and space launch systems designs."

Garver said, "The SLS heavy-lift rocket will take American astronauts farther into space than any human has ever gone before. It will expand our knowledge of the universe, reap benefits to improve life on Earth, inspire millions around the world and create good jobs right here at home."

"We're proud to be where we are today," said Marshall Center Director Robert Lightfoot. "We've done the due diligence necessary to get to this point -- thousands of configuration trades and studies -- and now it's time for us to start working on the hardware."

The event was held during Marshall's quarterly Small Business Alliance Meeting at the Davidson Center for Space Exploration, part of Huntsville's U.S. Space & Rocket Center.

NASA announced plans for the development of the SLS in September. It will carry NASA's Orion Multi-Purpose Crew Vehicle, cargo, equipment and science experiments to space -- providing a safe, affordable and sustainable means of reaching the moon, asteroids and other destinations in the solar system.

The planned vehicle will be the most powerful ever developed, evolving to a 130-metric-ton rocket built around a core stage, which will share common design, supplier base, avionics and advanced manufacturing techniques with the upper stage. It will use a liquid hydrogen and liquid oxygen propulsion system, relying on the space shuttle's RS-25 engine for the core stage and the J-2X engine for the upper stage. Dual, five-segment solid rocket boosters mounted to the sides of the tank will provide additional power. The design of the dual boosters on later flights will be determined through competition based on cost, performance and interface requirements.

The Space Launch System builds on the legacies of the Saturn rocket, space shuttle and Ares development efforts. It will take advantage of proven hardware and cutting-edge tooling and manufacturing technologies to significantly reduce development and operations costs. This strategy will help NASA maintain the development pace necessary to launch the first, full-scale test flight by late 2017.

For more information about SLS, visit:

http://www.nasa.gov/sls

For more information about NASA and agency programs, visit:

http://www.nasa.gov

SOURCE NASA

Contact:
NASA
J.D. Harrington, Headquarters, Washington
Phone: +1-202-358-5241
Email Contact Dan Kanigan, Marshall Space Flight Center, Huntsville, Ala.
Phone: +1-256-544-6849
Email Contact
Web: http://www.nasa.gov

Featured Video
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Business Technology Analyst for Surface Water Management at Everett, Washington
GIS Specialist for Washington State Department of Natural Resources at Olympia, Washington
Equipment Engineer, Raxium for Google at Fremont, California
Mechanical Engineer 2 for Lam Research at Fremont, California
Principal Engineer for Autodesk at San Francisco, California
Upcoming Events
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
URISA GIS Leadership Academy at Embassy Suites Fort Worth Downtown 600 Commerce Street Fort Worth, TX - Nov 18 - 22, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise