As part of the UK’s A14 improvement scheme which is one of the UK’s largest road projects, it was required to map a busy A14 highway junction including a highway intersection and a railway line. The complex mapping included multiple infrastructure layers (bridge, road and railway line) as well as an accurate snapshot of the surrounding buildings to avoid future damage claims during road reconstruction work.
Traditional Total Station usage posed harsh accessibility issues and safety hazards due to the busy highway and the passing trains. Traditional measurements also caused huge traffic blocks during the measurements process.
User Reviews |
More Reviews |
Review This File |
The mind boggling mapping incorporated numerous framework layers scaffold, street and railroad line just as a precise depiction of the encompassing structures to maintain a strategic distance from future harm claims during street reproduction work.
- Jack - Report As Inappropriate |
You are reviewing the
Download.
Your machine is locate at 3.149.23.123.